HAL quoted "257 man-hours" for a job Dassault said could be done in "100 man-hours".
from Current Affairs https://ift.tt/2NMaip4
Post Top Ad
Responsive Ads Here
Thursday, September 27, 2018
HAL may have lost Rafale as its man-hour bid was 2.57x Dassault's: Supriyo
Tags
# Current Affairs
Share This
About Unknown
Current Affairs
Labels:
Current Affairs
Subscribe to:
Post Comments (Atom)
Post Bottom Ad
Author Details
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. The main mission of templatesyard is to provide the best quality blogger templates which are professionally designed and perfectlly seo optimized to deliver best result for your blog.
No comments:
Post a Comment