JICA has approved to fund the stretches between Madhavaram to Sholinganallur (35.67 Km) and from Madhavaram to CMBT (16.34 Km) under Phase-II
from Current Affairs http://bit.ly/2PVHVBd
Post Top Ad
Responsive Ads Here
Saturday, December 22, 2018
JICA to fund nearly Rs 201.96 billion for Chennai Metro Phase-II
Tags
# Current Affairs
Share This
About Unknown
Current Affairs
Labels:
Current Affairs
Subscribe to:
Post Comments (Atom)
Post Bottom Ad
Author Details
Templatesyard is a blogger resources site is a provider of high quality blogger template with premium looking layout and robust design. The main mission of templatesyard is to provide the best quality blogger templates which are professionally designed and perfectlly seo optimized to deliver best result for your blog.
No comments:
Post a Comment